finishing bottom plates
On Thursday we had the final paving done, cut and sealed, so that on Saturday all the plates were ready for installation.
First, we glued a 10mm thick xtreme-isolator mat under each plate. Now we have a protection against cold, heat, humidity and noise from the streets.
I'm planning to continue at various construction sites:
- find slatted frame on ebay
- wooden frame for storage space, bed and other furniture
- select floor (probably PVC as a basis for camping and a fine carpet for shows and meetings)
- checkered plates for the entry areas
- carpet for front (driver / passenger)
- ceiling
- Still missing rubber seals for the tailgate
- electrical equipment (2nd battery, etc.)
So there is still plenty to do until the summer!



