Project: Chevy Van G30

06.01.2008planning the floor - 17.01.2008wheelhouse isolation - 03.02.2008various work - 09.02.2008finish bottom plates - 20.02.2008checker plate, Binford and slatted frame - 25.02.2008laying the PVC-floor - 01.03.2008installation of the checker plates - 29.03.2008bed legs and a bit of electronics - 05.04.2008mounting bed legs and starting with furniture - 05.05.2008progress with furniture - 19.06.2008furniture, electronics, lock and towbar - 10.07.2008electrical box and various small stuff - 07.08.2008Ok, push the button - 27.09.2008luggage net and bolted electrical box - 26.10.2008storage, leatherette and advertising - 15.11.2008start of the winter project - 04.01.2009preparing the upholstering of the leatherette - 21.01.2009cutting the leatherette - 08.02.2009finished cutting the leatherette - let's start upholstering! - 01.03.2009stapling and painting - 15.03.2009engine cover and sun visors - 29.03.2009dashboard painted and ceiling partly done - 05.04.2009ceiling, checker plate and rosewood - 09.04.2009installing the dashboard - 26.04.2009final spurt side panels, furniture re-installation and stereo - 10.05.2009door panels and cabinets - 31.05.2009carpet, window sealing, stereo and cutting fabrics - 23.08.2009various work during sommer - 06.09.2009installing stereo, part 1 - 27.09.2009installing stereo, part 2 - 20.10.2009front mud flaps and hifi switch - 24.10.2009installing the loudspeakers - 07.11.2009Loudspeakers, mud flaps and upholstery bandpass-box - 20.12.2009upholstery, shoe cabinet, sun visors and sidemarkers - 31.12.2009shoe cabinet and back door finished, carpet opening started -

shoe cabinet and back door finished, carpet opening started

shoe cabinet finished, front of the bed completely upholstered

And here the last pictures from 2009.

The shoe cabinet is upholstered and already mounted under the bed. Now the whole front of the bed is closed.

Andriy cuts the fleece.
Andriy cuts the fleece.
And I painted the cabinet with spar varnish.
And I painted the cabinet with spar varnish.
Door with  piano hinge, everything upholstered.
Door with piano hinge, everything upholstered.
Inside of the shoe cabinet. Water-proof rubber still missing, but that's easy...
Inside of the shoe cabinet. Water-proof rubber still missing, but that's easy...
And this is how the front of the bed looks now.
And this is how the front of the bed looks now.

back door finished

The upholstered covering of the back door is waiting for its mounting since month. Finally it is mounted now! Between ceiling and back door we mounted a new tarpaulin which holds back the rain water when the back door is opened.

back door cover with leatherette
back door cover with leatherette
stainless steel profile holds the
stainless steel profile holds the
...tarpaulin against rain water
...tarpaulin against rain water

started the openings of the carpets

Today we have started with the openings of the carpets. Therefor we need round-cut and bended checker plates.

0244 Teppichabschluss ausmessen
measuring and creating a prototype from old pavatex-plates