04.03.2007fuel tank pipe and exhaust tailpipe - 29.03.2007photo session - 21.04.2007door sealing and priming of the floor - 03.06.2007interior isolation - 12.07.20071st registration attempt and leaking radiator - 19.07.2007new radiator - 30.07.2007flanging the wheelhouse - 14.08.20072nd registration attempt failed - 21.08.2007break caliper and swimming pool - 13.10.2007having fun with the authorities - 29.10.2007track width registration - 26.11.20073rd registration attempt successful! -